Take our survey

Welcome to our survey - we're keen to hear from you about level crossing removals in your area. This survey should take about 5-10 minutes to complete. Feel free to skip sections (unless they are marked with an *).

Thanks for taking the time to provide us with your feedback.

Level crossing removal option

Raise the rail line over Skye/Overton Road and retain the existing road level.


Key information

  • Height of rail bridge approximately 8 metres
  • Width of rail bridge approximately 12 metres
  • Length of rail bridge approximately 900 metres
CLOSED: This survey has concluded.