Take our survey

Welcome to our survey - we're keen to hear from you about level crossing removals in your area. This survey should take about 5-10 minutes to complete. Feel free to skip sections (unless they are marked with an *).

Thanks for taking the time to provide us with your feedback.

Level crossing removal option 1

Lower the rail line into a trench and build a new Bondi Road bridge at the current road level.


Key information

  • Depth of rail trench approximately 6 metres
  • Single pedestrian crossing
  • Two pedestrian overpasses
  • Width of rail trench approximately 12 metres
  • Length of rail trench approximately 1100 metres

Level crossing removal option 2

Raise the rail line over Bondi Road and retain the existing road level at Station Street, Bondi Road and the Nepean Highway.


Key information

  • Height of rail bridge approximately 8 metres
  • Width of rail bridge approximately 12 metres
  • Length of rail bridge approximately 980 metres
CLOSED: This survey has concluded.