On behalf of the Victorian Government, the Level Crossing Removal Project is overseeing the removal of 75 dangerous and congested level crossings across Melbourne by 2025.

The level crossing at Camp Road, Campbellfield was removed in late 2017, by lowering the rail line into a trench under the road.

This project has allowed for the possibility of future infrastructure improvements in the area, including:

  • a second track on the Upfield line between Gowrie and Upfield stations
  • the widening of Camp Road to allow for traffic growth
  • a potential future station at Campbellfield
  • an extension of the Upfield bicycle path.

Camp Road is one of northern Melbourne’s busiest east-west arterial roads, carrying approximately 30,000 vehicles per day. It intersects the Upfield railway line in Campbellfield, and when the boom gates closed to allow trains to pass, the build-up of vehicles leads to lengthy delays and causes congestion.

The North West Program Alliance, comprising of Level Crossing Removal Authority, John Holland, KBR and Metro Trains Melbourne, delivered the project.


On behalf of the Victorian Government, the Level Crossing Removal Project is overseeing the removal of 75 dangerous and congested level crossings across Melbourne by 2025.

The level crossing at Camp Road, Campbellfield was removed in late 2017, by lowering the rail line into a trench under the road.

This project has allowed for the possibility of future infrastructure improvements in the area, including:

  • a second track on the Upfield line between Gowrie and Upfield stations
  • the widening of Camp Road to allow for traffic growth
  • a potential future station at Campbellfield
  • an extension of the Upfield bicycle path.

Camp Road is one of northern Melbourne’s busiest east-west arterial roads, carrying approximately 30,000 vehicles per day. It intersects the Upfield railway line in Campbellfield, and when the boom gates closed to allow trains to pass, the build-up of vehicles leads to lengthy delays and causes congestion.

The North West Program Alliance, comprising of Level Crossing Removal Authority, John Holland, KBR and Metro Trains Melbourne, delivered the project.

  • CLOSED: This survey has concluded.
    We are removing the level crossing at Camp Road, Campbellfield. We've done some early investigations to help us arrive at a preferred design. The preferred design is to lower the rail line into a trench under Camp Road.

    We encourage you to read the information available on this website and in our factsheet to learn more. Help us to understand what is important to you by completing this feedback by 5pm Friday 3 March.


    We are removing the level crossing at Camp Road, Campbellfield. We've done some early investigations to help us arrive at a preferred design. The preferred design is to lower the rail line into a trench under Camp Road.

    We encourage you to read the information available on this website and in our factsheet to learn more. Help us to understand what is important to you by completing this feedback by 5pm Friday 3 March.